100 Ludgate Hill – Strip Out
Client: Canada Life Asset Management
Completion Date: 2026
Services: Strip Out
Collaborations: Carpet Tile and RAF reuse initiative
Project Size: 51,000 - 100,000 sq ft
Project Overview
KpH was appointed as Principal Contractor to undertake soft strip works at 100 Ludgate Hill, a c.62,000 sq ft commercial building in the City of London adjacent to City Thameslink station. The strip out works formed part of a wider redevelopment project to upgrade the existing office accommodation, and enhance its sustainability credentials, including targeting BREEAM Outstanding.
Works were carried out from lower ground to Level 7, with part of the lower ground floor remaining occupied throughout, by the restaurant Leon. The project was completed on programme, with additional works accommodated during the final stages and handed over with no snagging identified.

Project Requirements
KpH delivered soft strip across all floors from lower ground to Level 7. Works included the removal of ceilings, non-load-bearing partitions, floor and wall finishes, WCs, servery kitchens and tea points, furniture, risers and associated M&E elements, together with builders’ works, making good and structural investigations. The works were predominantly undertaken using hand tools, with materials segregated at source and removed via dedicated waste lifts.
A team of 20 operatives were engaged on the project, led by a dedicated Site Manager, Supervisor and trainee Supervisor, and included an apprentice working towards the Demolition Operative (Level 2) Apprenticeship. KpH’s in-house BREEAM AP oversaw BREEAM compliance, including delivering zero avoidable waste to landfill, and the completion and sign-off of the Pre-refurbishment Audit and SWMP.
Project Challenges
- The loading bay contained Leon’s waste holding area and fire escape, as well as the escape route for City Thameslink. It was therefore essential to maintain access to the loading bay at all times and carefully coordinate deliveries and vehicle movements to ensure these routes remained clear and accessible.
- All waste movements and contractor logistics were managed through a single goods lift, with direct access to the loading bay. Careful coordination was therefore required to manage the movement of waste through the building, and to facilitate the two to three waste collections typically undertaken every day.
- Working concurrently alongside multiple sub-contractors, including fire alarm specialists, required exceptional coordination.
- The works were undertaken during a period of unseasonably hot weather and during a prolonged heatwave. Appropriate measures were implemented to ensure the teams’ welfare, to manage the excessive heat within the building and to maintain safe working conditions throughout the works.
Project Outcomes
- Early consideration of logistics and welfare requirements at tender stage supported the smooth delivery of the works. Particular attention was given to logistics arrangements, to enable the efficient segregation and management of different waste streams.
- Regular communication with key stakeholders, including the client, building management and the lower-ground tenant, helped maintain strong working relationships. Fortnightly progress meetings and ongoing dialogue ensured that key issues were communicated promptly and effectively managed.
We have now worked with KpH on three office strip out projects and all three were completed on time and on budget
Richard Nichol, Senior Asset & Development Manager, Canada Life Asset Management